Steelarches rise and spring from mass concrete piers asymmetrically, in length, between the road decks to mark the mainland and the navigation channels.
钢拱在路面平台中间,从大块混凝土桥墩(长度上)不对称地跳出来并升起,突出了大陆和航道。
2
Then the ultimate load-carrying capacity and the vertical top displacement of elastic steelarches are computed for different restrictions, different loads and different section sizes.
When the arch bridge was erected, arch sections were first assembled on the ground, the arch sections were then put together into an arch with the help of temporary supports, and the steelarches w...