In front of the feed water regulator, split, economizer, superheater export, between superheater outlet and main steamvalve, to heat the import and export, all should be installed pressure gauge.
The external nozzle mechanism comprises a three-way valve for connecting the tail end of the steamoutlet pipeline, a beverage straw and a nozzle respectively.