The paper analysed the causes that the heating pipe of the electric steamboiler was broken, amd put forward the design plan and executable ways that the protective system was installed on the boiler.
The method recycles the new steam condensate generated by the heating and pressing boiler thereby greatly decreasing the consumption of high-pressure new steam.
本方法对加热压煮器产生的新蒸汽冷凝水进行再利用,大大减少高压新蒸汽的消耗量。
3
Based on the plan of steamheating and dispersal heater etc situation, some valuable plan of boiler and heat net have been put forward.