The main parts of the system including the steam generator, the evaporator, the preheater, the final condenser, and the seawater tank are described in the paper.
该文介绍了海水蒸发器、预热器、终端冷凝器、海水箱等系统主要设备及海水淡化蒸发工艺流程。
2
The condensate passage is arranged around the steam passage and connected with the condensing zone and the evaporator.
该冷凝物通道则环绕于该蒸汽通道并连接该凝结区域与该蒸发器。
3
One end of the steam passage is connected with the evaporator to transfer steams from the evaporator.