Based on Shanghai metro M7 line project, the risk identification method is presented, taking dynamic risk identification process as the mainstream and staticrisk identification as a tool.
Various risk control and safety management measure have been built according to different risk rank and risk category, which including management and control technology of dynamic and staticrisk.