Therefore, they decided to complete the function of the number of substationequipment.
因此,他们要完成的功能决定于变电所设备的多少。
2
The date flow of substationequipment reparation and management is designed also in it.
最后,阐述了在线变电设备检修数字化管理的设计思想及其实现方式。
3
The basic measure to protect from large area pollutant flashover is to increase overall external insulation level for transmission and substationequipment.