All development wells of liwa n will be permanently installed with surface direct-reading subsurface pressure gauge and thermometer to support gas reservoir management and production optimization.
荔湾所有的开发井都将安装永久式的地面直读井下压力和温度计,为气藏管理和生产优化提供支持。
2
Support the panel with the thermometer attached in the specimen drum or rack in the same manner as the test specimens so that it will be subjected to the same influences.