It can be used to forecast the groundwater flow, land subsidence and the workablereserves.
利用该模型计算了地下水可开采量及地下水流场和地面沉降的预报。
2
For ensuring the mining production to be economical, continuous and in a state of equilibrium, one of the necessary steps to be taken is to account, determine, and balance the workable ore reserves.