When fill earth subgrade exercise part by part. The former part's gradient should be less than 1:5. Slope surface must be flat, so that, the construction machine can move from top to bottom.
Abstract: : the article mainly to the high speed hydraulic ramming machine in the practice of the highway subgrade engineering are discussed in this paper.