Plug in power, connect the air source and testingpipe.
插上电源,接上气源,接通检测管。
2
The mechanical analysis of operating the high temperature high pressure deep well testingpipe string is one of the key techniques in testing engineering design.
高温高压深井测试管柱的工作力学分析是测试工程设计的关键技术之一。
3
Dynamic character of oil testingpipe shock absorber system under impact load were searched which were based on finite element analysis software ANSYS in this paper.