The system testcore team was engaged in parallel with the development team over six iterations.
在六个迭代中,系统测试核心团队与开发团队并行工作。
2
From a skills transfer standpoint, the system testcore team, at the appropriate time, can introduce the new technology and release content to the broader system test team.
出于技能转移的立场,系统测试核心团队在适当的时候可以向较广大的系统测试团队介绍新的技术和版本内容。
3
During the development iterations, a subset of stress-related and memory leak defects were removed before the formal system test entry time due to the early testing by the system testcore team.