By via of the base point of filling up water in reservoir at the end of flood season, a pre-schedule line to typical hydro-graph and original water level target can be obtained.
该调度图方法以汛末蓄满水库为基本出发点,确定典型来水过程的预调度线和初始目标(控制)水位线;
2
Penetration performance in surface layer of concrete target was analyzed by stress wave damage theory, calculating method base on "simplified equivalent resistance line" was presented.