This paper introduces the integration of UPS and intelligent time distribution technique of weakcurrent systems in rail transit and its application in Shenzhen Metro Line 3 .
On account of the weak fault current and unstable fault arc, the problems of the single phase to ground fault line selection in the non-solid earthed network have never been thoroughly resolved.