Since it began, the program's enrollment has nearly doubled to 397, and last year the district moved Eagleridge to a strip mall (between a pizza joint and a laser-tag arcade).
Joint utilization of strip foundation under wall with static press pile is a kind of design and construction plan which can reduce man-hours and building costs.