The Contractor shall have adequate numbers and types of surveyequipment for the purposes of executing the Contract.
承包商应具有履行合同所需的足够数量和类型的测量仪器。
2
Before making the purchase of the new equipment, the Student Association conducted a survey on campus to see what kind of entertainment students liked best.
在购买新设备之前,学生会在校园里做了一项调查,看看学生们最喜欢什么样的娱乐活动。
3
You should give us as soon as possible the blueprint plan for the introduction of the equipment and a report on a survey of the feasibility entire plan.