When the pump sets lose electricity during operation, for the sake of preventing pipe failure by negative pressure, installed a surge shaft at the head of the pipe line.
当泵组运行失电时,为防止负压对管道的破坏,在管道首都设置了调压井。
2
With the FFT analysis it is analyzed that the pressure surge changing laws in the taper pipe and draft tube in time domain and frequency domain.
In the experimental study, the pressure surge data are acquired at 26 points from the taper pipe intake to the draft tube exit distributing at 8 sections under 6 stable operating conditions.