It included the processes of building, scheduling and up-linking instrument loads, managing the spacecraft in a fully automated mode, and verifying ground system and operational products.
它包括建立流程、时序安排和卫星上行链路仪器负荷,以全自动模式管理太空船,验证地面系统和运行产品。
2
This paper expounds the designing main points of multifunction surveying instrumentverifying place and introduces the functions and characteristics, with practical work.