Opening a channel, the Morganza spillway, is meant to relieve pressure on the levees protecting the cities of Baton Rouge and New Orleans.
打开莫干扎分洪道(Morganza Spillway)是为了缓解巴吞鲁日和新奥尔良的堤坝压力。
2
To improve the flow pattern and discharge capacity of the spillway of Bashan Hydropower Station, the left guide wall's form of the spillway's entrance channel is optimized by series of model tests.
On the basis of the Conclusion of safety certification, being directed against the project questions, the dam widen, spillway rebuild, irrigation conservancy and channel rebuild have been adopted.