In combination of typical project case, the detail discussion on correlative factors in toeslab design and design method are carried out.
结合典型的具体工程实例,对目前采用的趾板设计的方法、趾板设计中应考虑的相关因素进行了较详细的讨论。
2
The "4 + x" toeslab design concept makes toeslab design and foundation excavation easy and economy, so, it is more scientific and reasonable.
采用“4 + X”的趾板设计思想,趾板的设计和基础开挖灵活经济,因此更为科学合理。
3
The design of concrete face rockfill dam's toeslab is a process of iteration and optimization, the final determination of design parameter has finished in the construction process at last.