The invention relates to a loading double bed plate shipway.
本发明涉及一种载重型双底船台。
2
This paper introduces the working course and key points which let a V-bottom ship up to shipway with air-bag.
通过实例,介绍了V形底船气囊上排的实施过程和操作要点,以及上排过程中出现问题的处理方法。
3
Under a traditional installation method a shafting is first mounted on a shipway and after a launching, the shafting undergoes an alignment through the adjustment of a main machine location.