With the increase ofspanofarch Bridges, ultimate load-carrying capacity has received more attention in design and construction.
随着拱桥跨径的不断增大,拱桥的极限承载力问题已引起了人们的广泛重视。
2
Concrete was poured in separately from mid-spanofarch slab to the supports and then from the supports to the top chord of the arch chord so as to balance the pouring load.
Hanjialing Mountain tunnel is a key engineering in reconstructing the expressway from Shenyang to Dalian, and it is a highway tunnel with the greatest across spanofarch in Asia.