We analyse the sluicechamber by 3-D spline boundary element method.
用三维样条边界无法分析水闸闸室结构。
2
Such methods include that filling earth in the traffic bridge to change the position of gravitative centre of sluicechamber, and adding insertwalls to reduce the wall pressure of boxshaped wall.