The Working drawing scheme of surge silo of Dahongshan concentrator was introduced in brief, the relationship between the silo support, the silobase and the foundation type was described.
简介了大红山选矿厂中间矿仓施工图设计方案;阐述了圆筒仓支承与仓底板、基础形式的关系;
2
Some of the sites were up to 50 miles from the base so normally I would eat the foil packs they sent out to the site and slept in my parka on the steel-plated decks of the silo.