Important incidents occulting in station or system should be announced to all control rooms by the shiftengineer in charge.
值长应将电厂或系统发生的事故通告所有的控制室。
2
Use initiative and foresight to undertake tasks outlined within the preventative maintenance program without the direction of the ShiftEngineer/Chief Engineer.
在没有当班工程师/总工程师指导的情况下,主动并预见性的着手于预防性维修计划中规定的工作任务。
3
Reports daily by log book to the Director of Engineer of all irregularities during his shift and steps taken to rectify the problems highlighted.