The system meets the technical terms of automatic hump, and shunting routecontrol conforms to the technical terms of electric interlocking for large stations.
系统满足自动化驼峰技术条件,调车进路控制符合大站电气集中的技术条件。
2
The officer, almost unable to control his chuckle, explained to her that "22" was the route number, not the speed limit.
警官几乎控制不住自己的笑声,向她解释道,“22”是路线编号,不是限速。
3
This includes route reconnaissance and marking, convoy and oversize vehicle escort and river crossing control.