Through implementing this plan, we not only ensure the quality of highway, but also improve the scheduleofconstruction.
通过实施该方案,既保证公路质量,又提高施工的进度。
2
The Augustine panel questioned the cost, design and constructionscheduleof the rocket in a report submitted to the White House for consideration.
奥古斯汀专项研究小组质疑提交给白宫考虑的报告中的成本、设计以及建设计划。
3
Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.