Therefore, a series of technical measures are adopted in actual construction has taken for temperaturecontrolofconcrete construction.
因此,在实际施工中采取了一系列技术措施对混凝土施工进行温度控制。
2
Pipe cooling is now widely adopted to controltemperature rise in the construction ofconcrete DAMS.
在国内外混凝土坝施工中,广泛采用了水管冷却以控制坝体温度。
3
The problem of thermal stress and a need for temperaturecontrol in the mass concrete construction also occur in the roller compacted concrete dams(RCCD).