Equipment acceptance and delivery to site, siteerection support and turn-over.
设备验收和交货至现场,现场安装支持和移交。
2
Before work begins, an erection manual (see Secton 9.1), which if necessary takes account of the special circumstances of the site, shall be submitted.
开工前,必须提交架设手册(见第9.1章节),手册必须考虑风场的特殊环境条件。
3
It was built entirely from a metal skeleton (lightweight construction), most of which was built in the factory and transported to the site for erection and finishing touches.