In the experiment, the method of determination of impulse scale factor of visual instrument and the effect of measuring the time parameters with visual instrument are studied.
用试验初步研究了确定虚拟仪器冲击刻度因数的方法和虚拟仪器测量时间参数的效果。
2
All of these offered the constructive Suggestions for the correct assessment of mining technological conditions and the determination of mining scale of the mine in the future.
为矿区今后正确地估价开采技术条件和确定开采规模提供了建设性意见。
3
The determination of pipeline crossing scheme in large-scale rivers is influenced by geological conditions, hydrologic conditions, formation, environment and flood.