In this article, the author analyzes the causes of abnormal static load test of pipe pile in soft soil stratum, puts forward reasonable advices from design and construction aspect.
对软土地质条件下管桩静载荷试验异常原因进行研究分析,从设计和施工角度提出了合理建议。
2
The soilpipe in pilot room not follow and this room has not shower, to be repaired and added.
引航员房间厕所便池粪管堵塞了,该房间没有淋浴,需修理和增加。
3
A metal pipe buried in moist soil may corrode on the bottom.