If soilmovement is large, the pipe strain is controlled by the length of the landslide.
当滑坡长度较大时,管线的最大轴向应变受土体下滑位移控制。
2
Piles under the bottom of a pit are always subject to deflection due to excavation-induced soilmovement on soft foundation.
软弱地基开挖,流动土体对坑内桩基推挤,导致桩基偏位;
3
Reliable connectivity: PE pipe hot melt or fused interface strength is higher than the pipe body, joints will not load due to soilmovement or the role of living off.