The monitoring system, the contents and measures of soilgrouting reinforcement process were studied according to condition of project.
依据具体的工程条件,研究了注浆加固过程控制的监测系统、控制内容和实施方法。
2
Up to now grouting parameters for the porous surrounding rocks, depended on the penetrating coefficient for shallow surface soil, is unfit for the deep surface soilgrouting.
目前孔隙性围岩注浆参数大多是根据浅表土的渗透系数确定的,这不适合深层土注浆。
3
Grouting pressure was added on the borderline of grout and soil in simulation of grouting process.