Shallow buried-tunnelling method was used in the construction of high discharge pressure culvert for the first time and developed a new construction method in urban water distribution project.
在设计中将浅埋暗挖技术首次应用于大流量有压输水暗涵,进一步拓展了适用于城市输水工程的工程技术手段。
2
At the same time, the pollutant discharge rate is reduced from 25% to 16.5%. So the technol-ogy of shallow desalting can work steadily, the steam quality can be improved and the running cost lowered.