For the low chain tension (passive) side, this tube shall be significantly longer than the high tension sidetube.
对于低链条张力(无源)方面,这管筒应大大超过了高度紧张的一面。
2
The cleanliness factor of condenser water sidetube wall has been calculated using Zhouxian Power Plant's No. 5 Unit as example. The results are coincided with that of the field test during overhaul.
以邹县电厂5号机组为例,计算了凝汽器水侧管壁清洁系数,所得结果与大修试验结果相吻合。
3
The calculation method for bolt pretightening force of tubeside gasket and shell side gasket was proposed.