The entry arrangement, actual mining process and sideentry support of advanced mining at thin seam are introduced. The safe measures are made and has made good economic benefit.
With theory analysis, experiment research and spot test, this paper takes the lead in establishing technology system of gob-sideentry retaining with large section or small one.