The paper provides the key factors to control the pit construction by restricting heave of the bottomsoil and minimizing tunnel displacement.
文章阐述了如何通过控制基坑施工主要影响参数,进而限制坑底土体隆起,减小隧道位移。
2
Results show that exposure time of pit bottomsoil affects notably the diaphragm wall displacement during the periods of both soil exposure and pit bottom construction.
本文就坑底土层局部加固对支护结构位移的影响效果和规律,结合工程实例,并从理论上进行了分析研究。
3
The first basin would be filled with soil and a drain would be located at the bottom to allow leach of nutrients.