This paper deals with the problems associated with the operation of a bottomsluice.
本文简要地叙述了皎口水库泄洪底扎运行中发现的问题。
2
This paper discusses the calculated method to the unbalanced cutting power distribution in the structure of water sluicebottom board and poses the suggestion.
对水闸底板结构设计中的不平衡剪力分配计算方法进行了探讨,提出了建议。
3
Analyze the loading of the bottom slab of sluice in the way of elastic grade beam as well as points out the problems in the design program.