According to the actual condition of high-cutting slope of Wushan-Wuxi Road K95 section, general-purpose finite element program ANSYS is used to simulate excavation process.
根据两巫公路K 95段高切坡的实际情况,运用ANSYS软件对其开挖过程进行了模拟。
2
The rotary drilling rig excavation in Yingbin Road station means the start of the station enclosure construction.
迎宾路站旋挖钻机开挖,意味着该站围护施工的开始。
3
DEM is used to analyze the evolvement course of the excavation deformation of a road bedding lithologic slope in the Three Gorges reservoir region, and to simulate the effect of control project.