To assist production manager in development of bottleneck capacity plan, cycle time definition, resources planning and other staff plan requirement;
协助生产经理制定瓶颈产能计划, 工艺时间测算及优化,提出人力资源优化的建议;
2
Describes how to solve the problems of drilling and cutting for screws in the structure of bottleneck, to improve production rate and meet the demand of batch production for spare parts.
利用多轴组合钻解决瓶颈结构中螺孔的钻削问题,以提高劳动生产率,满足零件大批量生产的需要。
3
In this paper, the modification of spading plate was presented. As a result, the bottle-neck problem in grate-kiln production was solved.