By adopting some technology of advanced detection, adding temporary invert, sleevevalve pipe and lock foot bolts, the construction of the tunnel is completed safely and successfully.
For ease of installation, insert all flange bolts through the valve flange and then through the sleeve flange, but do not let the bolts extend beyond the surface of the flange rubber (See Figure 4).