In order to solve the problem of pollution in confluence drainage system, which is caused by initial rainwater, setting storage pond under the drainage pumping station is a effective measure.
在合流制排水系统中,排水泵站中设置调蓄池是解决城市初期雨水对水体污染的有效措施。
2
By engineering calculating, the flow chart and the engineering capacities of the main PSB reaction tank, the secondary setting tank and the seaweed pond are obtained.