The calculations show that the plan of two transversal and one longitudinal secondarybeam planning is more reasonable.
综合分析表明,采用两横一纵的次梁布置方案较为合理。
2
It discourses on the effects between the secondary beams in the floor slab of intersecting-beam system and points out the problems which happen usually.
论述了交叉梁系楼面结构体系中次梁间的相互作用,指出其中易出现的问题。
3
Engineering practice, many of whom overlap made the issue reinforced the upper primary and secondarybeam, Plagued many engineering and technical personnel.