The slabfloor was designed to be elevated on a steel frame which rests on 14 concrete piers.
楼板的设计是在一个钢框架的基础上,由14个混凝土柱子支撑。
2
This paper introduces an unbonded post-tensioned grid slabfloor system with a suspended mezzanine underneath for ventilation installations constructed by lift-slab method.
本文介绍一种新的结构体系——无粘结预应力井式梁板、悬挂技术夹层升板结构。
3
The concrete slabfloor of the basement is covered with a protective coating, while cable guides, conduits and pipes remain visible, with corridors and changing rooms illuminated indirectly.