The analys is about the maximum safety valve load on each flare header.
这项分析和单个火炬头的最大安全阀负荷有关。
2
The crude oil tank and flare system was assessed by using of LEC. Based on the assessment result, rectifying measures were proposed, to guarantee production safety of refinery.
The instrumented shutdown analysis forms the basis for the Fujian Ethylene Plant loads except for the maximum safety valve load on each flare header, where the non-instrumented basis is applied.