Within the protection zone for a water project, any act of blasting, sinking a well, quarrying rock, and collecting earth, which endangers the safety of the water project, shall be prohibited.
在水工程保护范围内,禁止进行爆破、打井、采石、取土等危害水工程安全的活动。
2
Under the precondition of ensured safety, a good blasting result of this project was obtained.
在保证了安全的前提下,该工程取得了良好的爆玻效果。
3
According to the condition of the blasting site, blasting parameter is determined reasonably, safety protection measures are adopted, and the blasting achieves the expected effect as well.