While stressing on the assessment of the post achievement, adding in organization, culture, key responsibilities and knowledge management, further improving the index settings of "KPI evaluation".
The designer can set post-pouring belt, using UEA con- crete and designing pre-stressing concrete structure to avoid the crack caused by temperature and shrinkage.
A great amount of post tensioned pre-stressing concrete single box beam for double track (as called the box beam hereinafter) has been used on the line.