The checking calculation of the post-stressedconcrete transfer beam in the construction period and the stretching sequence of the deformed bar is also introduced.
给出了结构的特点和节点构造,以及预应力转换梁施工阶段验算结果及预应力筋分段分批张拉的施工顺序。
2
Through engineering practice and theoretical analysis, the key points of quality and safe control in bonded post-tensioned pre-stressedconcrete construction was presented in this paper.