Trial run shall keep 2hrs under ratedcondition, each parameter cannot be beyond requirement and abnormal via verify.
泵在额定情况下连续试运转2小时,检验各参数不超标、无异常。
2
When design condition is different from the ratedcondition, it is necessary to check the capacity of the terminal unit under the design condition to ensure it is matched with the request.
设备设计工况与额定工况不同时,必须对设备的实际制冷能力进行校核,以保证实现设计目的。
3
The evaluation of the characteristics of the tea is rated in the condition of the normal production process, spring tea, a bud with a leaf and a bud with two leaves.