The upper part of shovel plough is provided with a ground break punner with length matched with the shovel plough.
所述的犁铲上部设 有长度与犁铲匹配的破土夯;
2
Analyzing on-site test data, the author provides strong punner construction parameters proper for this project, and concludes and analyzes problems happened in construction.