Electrical plans, bathroom and kitchen designs are analyzed in conjunction with the furniture and procurementschedule, resulting in a streamlined installation.
结合家具和采购计划,对电气规划、浴室和厨房设计进行分析,从而简化并提高安装工作的效率。
2
Ensuring that the procurement programme schedule is updated to ensure that production programme is being maintained relevant to procured items, materials.
确保采购计划时间表已经更新,确保与被采购项目和材料相关的生产计划已经得以执行。
3
The LEED Silver-targeted project was completed in just 21 months, through a design-build procurement process with an aggressive schedule and budget.